Service Plus installed a 10-ton twin furnace system with redesigned ductwork and integrated a 5-ton multi-zone mini-split system to address long-standing capacity and comfort issues. The original system had been undersized for over ten years, resulting in uneven temperatures and limited control. The new system was engineered with properly defined zones to improve airflow distribution, load matching, and temperature control across the facility. These improvements deliver consistent indoor comfort, reduce system strain, and improve overall energy efficiency.

